Pursuant to the California Environmental Quality Act, the Santa Clara Valley Water District, as the lead agency for the proposed project, prepared a Draft Environmental Impact Report and a Final Environmental Impact Report to evaluate environmental impacts of the proposed flood protection project. Below is a summary of the environmental reports and documents.

For information about the environmental process, contact:

Draft Environmental Impact Report 

The Draft EIR identified potentially significant environmental impacts associated with aesthetics, air quality, biological resources, cultural resources, geology/soils, greenhouse gas emissions, hazardous materials, hydrology/water resources, noise and vibration, land use, public utilities, recreation, and traffic. The majority of impacts were determined to be less than significant after the implementation of mitigation measures proposed. Construction impacts related to violation of applicable air quality and noise/vibration standards were determined to be significant and unavoidable even after implementation of air quality and vibration mitigation measures.

The Draft EIR was published and circulated between November 1, 2013 and December 15, 2013. The public review period was extended to February 21, 2014 to accommodate additional review time by the public agencies.

 Draft Environmental Impact Report 

 Appendix A - Notice of Preparation 
 Appendix B - Planning Study Report 
 Appendix C - Stream Maintenance Program Update 
 Appendix D - Mitigation Monitoring and Reporting Program 
 Appendix E - Cultural Resources Technical Report 
 Appendix F - Candidate Key Observation Point Locations 
 Appendix G - Air Quality and Greenhouse Gas Emissions Calculations 
 Appendix H - Geotechnical Studies 
 Appendix I - 2007 Hazardous Materials Report 
 Appendix J - Construction Noise Calculations 
 Appendix K-1 - Traffic Construction Trip Calculations 
 Appendix K-2 - Traffic LOS Analysis for Caribbean Bridge Replacement 
 Appendix L - Special-Status Plant Species Considered but Rejected for Occurrence in the Project Area 
 Appendix M - Detailed Descriptions of Special-Status and Locally Significant Plant Species Potentially Occurring in the Project Area 
 Appendix N - Detailed Descriptions of Special-Status Wildlife Species Potentially Occurring in the Project Area 
 Appendix O - Preliminary Delineation of Wetlands and Other Waters 
 Appendix P - Chapter 3.3 Biological Resources Figures:  Soil Maps, West Channel Habitat Impacts Maps, East Channel Habitat Impacts Maps 

Final EIR cover image

Final Environmental Impact Report

The Final EIR responds to public comment received on the Draft EIR during the public review period, as well as reflects changes to the Draft EIR made to address comments received during public circulation. The Final EIR was certified on September 9, 2014.

Final Environmental Impact Report (August 2014)

The Final EIR, Draft EIR and all related documents can be reviewed on any water district business day between the hours of 8 a.m. and 5 p.m., at the Headquarters building located at 5700 Almaden Expressway, San Jose, CA 95118.