print Font Size: small font medium font large font

Construction Administration

Notice to Bidder, Planholders List, Pre-Bid Meeting Attendees, and Bid Results are available by clicking on the Construction Projects links noted under each project heading. 

Plans and Specifications for construction projects are available for purchase from the District.  Refer to Notice to Bidders for costs, and other details.  Requests for Plans and Specs can be processed as noted below. 

Download Request Form in Word or Adobe PDF. Follow instructions at top of form.
For Security-Sensitive Projects see special form listed below project title below.

  1. Submit Request Form by e-mail (scvwdplanroom@valleywater.org) or Fax.
  2. Submit Request Form in person at the district headquarters building.
  3. Submit Request Form by USPS mail or Express mail.

Prospective bidders are advised that any contractor who is awarded a public works project and intends to use a craft or classification not shown on the general prevailing wage determinations, may be required to pay the wage rate of that craft or classification most closely related to it.  Refer to State Department of Industrial Relations for current general prevailing wage determinations.

In order to qualify as a "small business" you must be certified as a small business by the California Department of General Services.  Search (sample) for Small Businesses at Bid Sync (California DGS database).

Each proposal must be accompanied by cash, certified check, cashier's check, or bidder's bond in the sum of not less than 10 percent of the total aggregate of the proposal.  Checks and bonds must be made payable to the Santa Clara Valley Water District.  The bidder's security may be considered by the District as liquidated damages if the successful bidder fails to file satisfactory bonds, as required by the contract documents, or fails or refuses to enter into a contract within the specified time.

Contacts

Beth Redmond (bredmond@valleywater.org),
Unit Manager, Capital Program Planning and Analysis
(408) 630-2682

District Plan Room (scvwdplanroom@valleywater.org)
(408) 630-3088

Forms

Construction Projects

2014 (Advertise Date)


Snell Pipeline (Coyote Creek Line Valve to Aborn Line Valve) Rehabilitation Project
Bid Opening: October 1, 2014
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1, Apparent Low Bid #2, Apparent Low Bid #3
Notice to Bidders
Planholders List
Addendum #1 (Issued 09-15-14)
Addendum #2 (Issued 09-25-14)
Pre-Bid Meeting: September 3, 2014
Agenda
Sign-in Sheet

Rinconada Water Treatment Plant Reliability Improvement Project
Prequalification Application Submission Deadline: September 25, 2014
Notice of Request for Prequalification (Revision 1 Issued 08-28-14)
Prequalification Participant List
Request for Plans & Specs and Confidentiality Statement
Prequalification Application (Revision 1 Issued 08-28-14)
Addendum #1 (Issued 08-14-14)
Addendum #2 (Issued 08-28-14)
Addendum #3 (Issued 09-11-14)
Addendum #4 (Issued 10-09-14)
Addendum #5 (Issued 10-15-14)
Prequalification Conference/Site Visit: August 7, 2014 & September 9, 2014
Presentation
Sign-in Sheet
Contractors' Contact Information and Affidavit (Revision Posted 10-09-14)
Proposed Prequalification Rating List (Posted 10-22-14)
Prequalified Contractors List (Posted 11-25-14)

South County Recycled Water Pipeline Project, Phase 1B, Camino Arroyo Service Line Project
Bid Opening: August 6, 2014
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1, Apparent Low Bid #2
Notice to Bidders
Planholders List
Addendum #1 (Issued 07-09-14)
Addendum #2 (Issued 07-16-14)
Addendum #3 (Issued 07-22-14)
Addendum #4 (Issued 08-01-14)
Pre-Bid Meeting: July 23, 2014
Agenda
Sign-in Sheet
District Furnished Documents

Guadalupe River Fish Passage Modification, Calabazas Creek Storm Drain Outfall Replacement, San Tomas Aquino Creek Storm Drain Outfall Replacement Project(s)
Bid Opening: July 30, 2014
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1, Apparent Low Bid #2, Apparent Low Bid #3
Notice to Bidders
Planholders List
Addendum #1 (Issued 07-10-14)
Addendum #2 (Issued 07-23-14)
Pre-Bid Meeting: July 17, 2014
Agenda
Sign-in Sheet
District Furnished Documents

IRP2 Water Treatment Plant Operations Building Seismic Retrofit Project
Bid Opening: June 25, 2014
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1, Apparent Low Bid #2, Apparent Low Bid #3
Notice to Bidders
Planholders List
Addendum #1 (Issued 05-12-14)
Addendum #2 (Issued 05-23-14)
Addendum #3 (Issued 06-06-14)
Addendum #4 (Issued 06-13-14)
Addendum #5 (Issued 06-19-14)
Pre-Bid Meeting: May 13, 2014
Agenda
PowerPoint
Sign-in Sheet
District Furnished Documents

South Campus Generator Replacement Project
Bid Opening: May 21, 2014
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1, Apparent Low Bid #2, Apparent Low Bid #3
Notice to Bidders
Planholders List
Addendum #1 (Issued 05-14-14)
Pre-Bid Meeting: May 8, 2014
Agenda
Sign-in Sheet

Lower Silver Creek Reach 6B Project
Bid Opening: May 28, 2014
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1, Apparent Low Bid #2, Apparent Low Bid #3
Notice to Bidders
Planholders List
Addendum #1 (Issued 05-02-14)
Addendum #2 (Issued 05-09-14)
Addendum #3 (Issued 05-19-14)
Pre-Bid Meeting: April 21, 2014
Agenda
Sign-in Sheet
Optional Site Showing
Sign-in for Optional Site Showing
District Furnished Documents


2013 (Advertise Date)

Milpitas Pipeline Rehabilitation Project
Bid Opening: December 18, 2013
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1, Apparent Low Bid #2, Apparent Low Bid #3
Notice to Bidders
Planholders List
Addendum #1 (Issued 11-08-13)
Addendum #2 (Issued 12-02-13)
Addendum #3 (Issued 12-12-13)
Pre-Bid Meeting: December 4, 2013
Agenda
Sign-in Sheet

Guadalupe River Fish Passage Modification, Calabazas Creek Storm Drain Outfall Replacement, San Tomas Aquino Creek Storm Drain Outfall Replacement Projects
Bid Opening: September 4, 2013
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1, Apparent Low Bid #2, Apparent Low Bid #3
Addendum #1 (Issued 08-28-13)
Planholders List
Notice to Bidders
Pre-Bid Meeting: August 22, 2013
Agenda
Sign-in Sheet
District Obtained Permits
NPDES General Permit (Order #99-08-DWQ)
NPDES General Permit Attachment C Risk 1 Requirements (2009-0009-DWQ)
Stormwater Best Management Practices Handbook - Construction (has to be purchased from website)
Solid Materials Management Report Form S12201
•District Stream Maintenance Permits (404 Permit from the U.S. Army Corps of Engineers, 401 Water Quality Certification/Waste Discharge Requirements from the Regional Water Quality Control Board, 1602 Streambed Alteration Agreement from the California Department of Fish and Game, Best Management Practice Manual-2013).
Guadalupe River Project and Guadalupe Creek Restoration Project Permit

Rinconada Water Treatment Plant Residuals Management and Treated Water Valves Upgrade Project
Bid Opening: August 14, 2013
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1, Apparent Low Bid #2, Apparent Low Bid #3
Addendum #1 (Issued 07-08-13)
Addendum #2 (Issued 07-25-13)
Addendum #3 (Issued 08-06-13)
Addendum #4 (Issued 08-07-13) 
Planholders List
Notice to Bidders
Pre-Bid Meeting: June 27, 2013
Agenda
Sign-in Sheet
PowerPoint Presentation
District-Furnished Reports
Geotechnical Investigation, Water Treatment Improvement Project—Stage 1, Penitencia, Rinconada, and Santa Teresa Sites, Revision 1, by Harza Engineering Company, 1998;
Earthwork Engineering Report, RWTP, Soil Mechanics and Foundation Engineers Inc., August 1965;
Foundation Engineering Report, RWTP, Soil Mechanics and Foundation Engineers Inc., February 1966;
Final Geotechnical Report, Residuals Management Project, Rinconada Water Treatment Plant, Los Gatos, California, Santa Clara Valley Water District, by Geotechnical Consultants, Inc., December 2012;

Microwave Telecommunications Project
Bid Opening: July 31, 2013
Addendum #1 (Issued 07-25-13)
Planholders List
Notice to Bidders
Bid Results - Preliminary until awarded by the  Board of Directors
Apparent Low Bid #1, Apparent Low Bid #2, Apparent Low Bid #3
Pre-Bid Meeting: July 16, 2013
Sign-in Sheet
VIDEO - Windows_Pacheco
District-Furnished Reports
A reference copy of the results of the asbestos assessment of Coyote Pumping Plant, and Winfield Warehouse, Rinconoda and Santa Teresa Water Treatment Plants, District’s 2013 Asbestos Notification, is available at the District’s office for Contractor review;
The data sheets for the electronic equipment provided by the district are available at the District’s office for Contractor review;
The structural analysis of all microwave dish bracing is available at the District’s office for Contractor review.

Kirk Diversion Dam Replacement and Fish Screen Project
Bid Opening: April 24, 2013
Addendum #1 (Issued 04-18-13)
Addendum #1 Drawings (Issued 04-18-13)
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees (Re-posted 04-10-13)
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1, Apparent Low Bid #2Apparent Low Bid #3
As-Built Drawings
Kirk Dam Relocation Plan - dated September 1991
Los Gatos Creek Kirk-Page Turnout Erosion Repair - dated August 2002 (Re-posted 04-18-13, per Addendum #1)


Santa Teresa Water Treatment Plant Incompatible Materials Project Stage II 

The Santa Clara Valley Water District previously pre-qualified general contractors to bid on the Santa Teresa Water Treatment Plant Incompatible Materials Project Stage II in a prequalification process that was completed on December 21, 2012. As a result of that pre-qualification process, the following contractors were determined to be qualified and eligible to bid on this Project:
     Anderson Pacific Engineering Construction, Inc.
     J.R. Filanc Construction Company, Inc.

Only the above identified prequalified contractors are eligible to submit bids for this Project.

Bid Opening: April 10, 2013 
Addendum #1 (Issued 03-12-13)
Addendum #2 (Issued 04-04-13)
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees (Posted 03-19-13)
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1 (Awarded 04-23-13), Apparent Low Bid #2

Crest Building Roll-Up Door Replacement Project
Bid Opening: February 27, 2013
Addendum #1 (Issued 02-21-13)
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees (Posted 02-06-13)
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1 (Awarded 03-12-13), Apparent Low Bid #2, Apparent Low Bid #3

Santa Teresa Water Treatment Plant Incompatible Materials Project Stage II
PREQUALIFICATION OF BIDDERS REQUIRED
Prequalification Application due November 21, 2012, 2:00 PM
Notice of Request for Prequalification
Prequalification Application
Reference Documents
Prequalification Participant List
Contractors’ Contact Information and Affidavit (Posted 11-21-12)
Proposed Prequalification Rating List (Posted 12-05-12)
Prequalified Contractors (Posted 12-21-12)

2012 (Advertise Date)

Stevens Creek Pipeline Rehabilitation
Bid Opening: December 5, 2012
Addendum #1 (Issued 11-29-12)
Addendum #1-Drawings (Issued 11-29-12)
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees (Posted 11-14-12)
Bid Results - Preliminary until awarded by the Board of Directors 
Apparent Low Bid #1 (Awarded December 18, 2012), Apparent Low Bid #2, Apparent Low Bid #3

Upper Guadalupe River Reach 7 Building Demolition and Soil Remediation at
Willow Street and Lelong Street
Bid Opening: October 10, 2012
Addendum #1 (Issued 09-12-12)
Addendum #2 (Issued 10-04-12)
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees (Posted 09-18-12)
Bid Results - Preliminary until awarded by the Board of Directors 
Apparent Low Bid #1 (Awarded October 23, 2012), Apparent Low Bid #2, Apparent Low Bid #3
12.04. District-Furnished Reports
12.04.03. Hazardous Materials Investigation Report 
    A. Asbestos and Lead Survey Report 
    B. Soil Hazardous Materials Investigation reports 
        1. Level II Hazardous Materials Investigation Report 
            • Text 
            • Plates 
            • Table 4 
            • Appendix A 
            • Appendix B 
            • Appendix C 
        2. Hazardous Substance Liability Assessment, Limited Phase II Investigation 
        3. Updated Assessment of Soil and Groundwater Impacts and Site Cleanup Needs 
        4. & 5. Site Investigation Summary Report (See Appendix A) &
                   Risk Analysis and Assessment Report 
        6. Groundwater Monitoring Report 
        7. Remedial Action Plan
12.04.06. Historic Report
12.04.07. Monitoring Well Logs

Santa Clara, Campbell and Mountain View Distributaries
Pipeline Rehabilitation Project  
Bid Opening: September 5, 2012
Addendum #1 (Issued 08-17-12)
Addendum #2 (Issued 08-31-12)
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees (Posted 08-22-12)
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1 (Awarded September 25, 2012), Apparent Low Bid #2, Apparent Low Bid #3

Water Protection Project (Security-Sensitive)
Bid Opening: August 8 22, 2012
Addendum #1 (Issued 07-31-12)
Addendum #1-Drawing (Issued 07-31-12)
Addendum #2 (Issued 08-17-12)
Request Form for Security-Sensitive Project (Word or Adobe PDF)
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees (Posted 07-18-12)
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1 (Awarded September 25, 2012), Apparent Low Bid #2, Apparent Low Bid #3 (N/A)

Santa Teresa Water Treatment Plant Incompatible Materials Project Stage II
Bid Opening: June 6, 2012
Addendum #1 (Issued 05-23-12) 
Addendum #1-Drawings (Issued 05-23-12)
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees (posted 05-21-12) 
Bid Results - All Bids Rejected (June 26, 2012)

Lower Silver Creek Flood Protection and Creek Restoration Project
Story Road to Moss Point Drive (Reaches 5C to 6A)
Bid Opening: April 11, 2012
Addendum #1
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees (posted 03-22-12)
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1 (Awarded April 24, 2012), Apparent Low Bid #2, Apparent Low Bid #3
Site Investigation Report-Part #1
Site Investigation Report-Part #2
Site Investigation Report-Part #3
Geotechnical Report
12.04.02. Environmental Report 
    A.1. Santa Clara Valley Water District. Fourth Addendum to the Initial Study/Negative Declaration for the Lower Silver Creek Watershed Project, Reaches 4, 5, and 6, May 2010.
12.04.05. As-Built Drawings
The following are the drawings known to exist: 
    A. San Jose Water Company – Story Road Water Main Installation As-Built Drawings, March 2008 
    B. Story Road 
        1. 3-6485, Home Depot San Jose – McGinness Avenue & Story Road, 2008 (Record Drawing) 
        2. TR 1007, Tract No. 1007 Mayfair Heights Unit No. 2, 1952 
        3. Traffic Signal Installation Lyndale Ave. and Story Road, CSJ, 2001 
    C. Murtha Drive 
        1. TR-1794, Tract No. 1794 Foster Village, 1956 
    D. Moss Point Drive 
        1. GE-428, Culvert for Silver Creek at Moss Point Drive, 1972 
        2. TR-2825, Tract No. 2825 El Dorado Homes Unit No. 3, 1960 (As-Built) 
        3. TR-4728, Tract No. 4728 El Dorado Estates Unit No. 6, 1969 (As-Built) 
    E. (No drawings) 
    F. Interim Improvement of Silver Creek from Capitol Expressway Upstream to 240 Feet +/- South of Murtha Drive, Santa Clara Valley Water District, 11-22-74 
    G. Construction of Lower Silver Creek from Capitol Expressway to Cunningham Avenue, Santa Clara Valley Water District, 12-16-77

Rinconada Water Treatment Plant Boiler Replacement Project
Bid Opening: March 28, 2012
Addendum #1
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees (re-posted 3-20-12)
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1 (Awarded April 24, 2012), Apparent Low Bid #2, Apparent Low Bid #3
ASBESTOS CONTAINING MATERIALS AND LEAD BASED PAINTS ABATEMENT SPECIFICATIONS
LIMITED ASBESTOS AND LEAD PAINT SURVEY REPORT

2011 (Advertise Date)

Santa Teresa Water Treatment Plant Incompatible Materials Valves Replacement & Grading Project
Bid Opening: October 19, 2011
Addendum #1
Addendum #2
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1 (Awarded October 25, 2011), Apparent Low Bid #2 (N/A), Apparent Low Bid #3 (N/A)

Penitencia Water Treatment Plant Maintenance Building Project
Bid Opening: October 12, 2011
Addendum #1
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1 (Awarded November 8, 2011), Apparent Low Bid #2, Apparent Low Bid #3
Geotechnical Report
Environmental Report
HazMat Report North-South Sample Locations
HazMat Report Landscaping Sample Locations

Santa Teresa Water Treatment Plant Incompatible Materials Coating Project
Bid Opening: TUESDAY, October 4, 2011 October 19, 2011
Addendum #1
Addendum #2
Addendum #3
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results - Preliminary until awarded by the Board of Directors 
Apparent Low Bid #1 (Awarded October 25, 2011), Apparent Low Bid #2 (N/A), Apparent Low Bid #3 (N/A) 

Administration & Headquarters Buildings Lobby Security Project
Bid Opening: November 30, 2011 
Addendum #1
Addendum #2
Addendum #2: Attachment 1 - SPECIFICATIONS AND CONTRACT DOCUMENTS, REVISED COPY—OCTOBER 2011
Addendum #2: Attachment 2 - MAPS AND CONSTRUCTION DRAWINGS, REVISED - OCTOBER 2011
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results (Revised and re-posted 12-1-11) - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1 (Awarded 12-13-11), Apparent Low Bid #2, Apparent Low Bid #3 (Revised and re-posted 12-1-11)

East Pipeline, Patt Ave. Line Valve to Piedmont Valve Yard, and Expansion Joint Replacement Project
Bid Opening: August 3, 2011
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results - Preliminary until awarded by the Board of Directors 
Apparent Low Bid #1 (Awarded August 23, 2011), Apparent Low Bid #2

Robert W. Gross Pond 1A Fish Screen 
Bid Opening: June 29, 2011  July 6, 2011
Addendum #1
Addendum #2
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results - Preliminary until awarded by the Board of Directors 
Apparent Low Bid #1 (Awarded July 19, 2011), Apparent Low Bid #2, Apparent Low Bid #3

South County Recycled Water Pipeline
Short-Term Phase 1A Project
Bid Opening: May 11, 2011
Addendum #1
Addendum #2
Bid Form F (Fillable Form)-reposted 05/05/11
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1(Awarded May 24, 2011), Apparent Low Bid #2, Apparent Low Bid #3

2010 (Advertise Date) 

Pacheco Pumping Plant RegulatingTank
Phase B - Seismic Retrofit
Bid Opening: January 26, 2011
Addendum #1
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1 (Awarded February 22, 2011), Apparent Low Bid #2, Apparent Low Bid #3

Rinconada Water Treatment Plant
Primary Electrical System Improvement,
Standby Power System Upgrade, and
Trunk Cables Replacement
Bid Opening: February 9, 2011 February 2, 2011 January 26, 2011 
Addendum #1
Addendum #2 - re-posted 01-25-11 at 5:40 PM
Addendum #3
12.04.06. Arc Flash Hazard Analysis Report
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results - Preliminary until awarded by the Board of Directors
Apparent Low Bid #1 (Awarded March 8, 2011), Apparent Low Bid #2, Apparent Low Bid #3

Almaden Valley Pipeline Project
Bid Opening: November 3, 2010
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results

Santa Clara Conduit Reach 3 Rehabilitation Project
Bid Opening: November 3, 2010
Addendum #1 
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results

Vasona Pump Station Pavement Repairs and Improvements
Bid Opening: October 6, 2010
Addendum #1
Addendum #2
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results

East Pipeline Rehabilitation Project from the Ocala Line Valve to the Aborn Line Valve
Bid Opening: August 18, 2010
Addendum #1
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results

South Bay Advanced Recycled Water
Treatment Facility Project

Bid Opening: August 25 September 8, 2010
Addendum #1
Addendum #2
Addendum #3 
Addendum #4
Addendum #5
Bid Form F, Rev.1 (Fillable Form)
ARWTF Boring Logs and Soil Analysis
ARWTF Boring Logs Location Map (Posted 8-20-10)
ARWTF Soil Sample Analysis
ARWTF Soil Sample Analysis-Full Report-referenced in Add #3 (Posted 8-30-10)
Updates to "Contractor Information Package"
    Membrane Train Assembly DWG_10000023969_00 (Posted 8-20-10)
    Revised 24053 02 Instrument List (Posted 8-20-10)
ARWTF Preconstruction Environmental Sampling Report (Posted 8-26-10)
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results

Gold Street Educational Center Project
Bid Opening: September 8, 2010
Geotechnical Investigation and Geologic Hazards Review
Soil and Groundwater Quality Evaluation
Addendum #1
Addendum #2
Addendum #3
Addendum #3-Drawings
Addendum #4
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees (August 26) 
Bid Results - Revised 09-17-10

 

Lower Silver Creek Flood
Protection and Restoration Project

Bid Opening: July 14 28, 2010
Site Investigation Report-Part #1
Site Investigation Report-Part #2
Site Investigation Report-Part #3
Geotechnical Report
PGE Gas Main Relocations (4 drawings)
PGE Gas Main Relocation - Capitol Expwy @ Mervyn's Way (1 drawing)
SJ Water Main Relocation at Jackson Ave
Addendum #1
Addendum #1 Enclosure: Santa Clara County Encroachment Permit
Addendum #2
Addendum #3
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results

Calabazas Creek
Saratoga-Sunnyvale Road Box Culvert
And UPRR Bridge Replacements
 
Bid Opening: June 30, 2010
Addendum #1
Addendum #1-Attachment 1-Permit
Addendum #1-Attachment 2-Sheet C-29
Addendum #1-Attachment 3-Sheet S-6
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results

Rinconada Water Treatment Plant
Road Repairs and Improvements Project
Bid Opening: June 9, 2010
Addendum #1
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results

Rinconada Water Treatment Plant
Elevator and Fire Alarm Project
Bid Opening: June 2, 2010
Addendum #1
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results

Administration Building
HVAC Ductwork Replacement Project
Bid Opening: May 26, 2010 June 2, 2010
Addendum #1
Addendum #2
Addendum #3
Notice to Bidders
Planholders List
Pre-Bid Meeting Attendees
Bid Results

Santa Teresa Water Treatment Plant
Incompatible Materials Project

Bid Opening: March 10, 2010
Addendum #1
Addendum #1 Drawings
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

2009 (Advertise Date)

Upper Guadalupe River, Reach 6
I-280 to Union Pacific Railroad Bridge
Bid Opening: January 27  February 17, 2010
Addendum #1
Addendum #1 - Attachments
Addendum #2
Addendum #3
Plan Sheet R-9, Page 110 of 110
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results
EIR (Environmental Impact Report)
    Second Addendum to the Final EIR
        F1 Site Location 123108.pdf 
        F2 Site Aerial 123108.pdf 
        F3A GUAD6 MAP01 010209.pdf 
        F3B GUAD6 MAP02 010209.pdf 
        F3C GUAD6 MAP03 010209.pdf 
        F4 GUAD6 CNDDB 031808.pdf 
        F5A GUAD6 IMPACTS MAP01 010209.pdf 
        F5B GUAD6 IMPACTS MAP02 010209.pdf 
        F5C GUAD6 IMPACTS MAP03 010209.pdf 
        Biological Resources and Wetland Assessment 
Geotechnical Report
Self-Monitoring Program Water Quality Sampling Plan

East Pipeline Rehabilitation Project
From the Patt Avenue Line Valve to the Ocala Avenue Line Valve
Bid Opening: December 9, 2009
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

Pacheco Pumping Plant ASD Replacement Project
Bid Opening:  January 11, 2010
Addendum #1
Addendum #2
Addendum #3
Addendum #4
Addendum #5
Addendum #6
Addendum #7
Addendum #8
Addendum #9
Bid Documents - Conformed 12-22-09
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

Pond A8 Applied Study Project
Bid Opening:  November 5, 2009
Addendum #1
Addendum #2
Addendum #3
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results
Photos, Boring Logs, and Analytical Report for Appendix H

West Pipeline Rehabilitation Project
Bid Opening:  September 2, 2009
Addendum #1
Addendum #2
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

Lower Silver Creek, Reach 6B, Moss Point Drive to Cunningham Avenue Project
Bid Opening:  August 5, 2009

Haz Mat and Geotech Reports - Reaches 5 & 6
- HazMat_LSC_R5&6.pdf
- HazMat_LSC_R5&6_Appendix.pdf
- HazMat_LSC_R5&6_GW_Analytical.pdf
- HazMat_LSC_R5&6_Soil_Analytical_Custody.pdf
- Geotech_LSC_R5&6.pdf
- Geotech_LSC_R5&6_Appendix.pdf

Addendum #1
Addendum #2
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

Rinconada Water Treatment Plant and Vasona Pump Station Voice and Data Modifications Project
Bid Opening:  August 12, 2009
Addendum #1
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

Rinconada Water Treatment Plant Clarifier Rehabilitation Project
Bid Opening:  July 22, 2009
Addendum #1
Addendum #2
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

Rinconada Water Treatment Plant Chemical Systems Upgrade Project
Bid Opening :  June 3, 2009
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

South Campus Water Deliver Project
Bid Opening:  May 27, 2009
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

Jacques Gulch Restoration
Bid Opening:  April 29, 2009
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

Penitencia Water Treatment Plant Standby Power Upgrade Project
Bid Opening:  May 13, 2009
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

Penitencia Water Treatment Plant Backwash Pump Replacement Project
Bid Opening:  March 25, 2009
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results

Rinconada Water Treatment Plant Valves Replacement Bid
Bid Opening:  March 11, 2009
Notice to Bidders
Planholders List
Pre-bid Meeting Attendees
Bid Results